BIM Quantity Take-Off (QTO) with HKSMM

Wavy Abstract Background
Application:
  • Pre-Tender measurement / re-measurement for lump-sum contract with drawings and specifications
  • Specialize in re-bar measurement
  • Efficient and accurate QTO submission before tender return
  • QTO based on BIM knowledge
  • Provide 3D BIM model except measurement breakdown​
Case Sharing: Disputes over Interim Payments / Final Accounts​
  • Main Contractor intended to re-measure the work done with accurate information within a short period of time
  • Main contractor employed B-BIM for quantities re-measurements
  • B-BIM provided a detailed breakdown of quantities within 2 weeks
  • Main contractor was convinced by the re-measurements and agreed on quantities re-measured by B-BIM
  • Disputes have been settled and sub-contractor resumed to work